Talk:Logistics Projects
Jump to navigationJump to search
From all of us at the RS, to you two. We wish you the best of luck on your satanic project! We will try to hinder..erm.. help in any way possible.
PS. We also think your friggin crazy!
Joshua Hawkins 08:36, 6 July 2006 (EDT)
Vaughan's old project stuff
The Logistics Office maintains the fictional aspects of the club, and co-ordinates storyline material into a cohesive whole. The Office was reopened in April 2006 by then-Captain David Vaughan, and since then has been working to research and compile a detailed fictional history of the club, to aid with the planning and continuity of future campaigns. Below is a list of all the current, proposed and completed projects of the Logistics Office. == Current Projects == :Lt. Col. David Vaughan ::Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: Paladin101, Paladin102, Paladin103, Paladin104, Paladin105, Paladin106, RID001, RgF410, PBF602X, PBF602T, IBG604, RID002 ::Project 1-2-B: ::*Split the Star Destroyer Gorgon article into two entries — the Darkstar, and the Gorgon::*Split the Star Destroyer Kunder's Glory article into two entries — the Kunder's Pride, and the Kunder's Glory::*Address the M/CRV group Cilliip issue — merge multiple ship entries during IBG Tour 1 into the single group::*Split all instances of the transport group Storm into separate entries, reflecting that they are not the same vessels in every instances::*Address the CRV group in PBF Tour 2/3::*Add detail to Freight Transport entries, determining if they are Type C, Type H or Type K::*Improve earlier craft entries — bring them up to the same standard as later entries: ::**PBF101, PBF102, PBF103, PBF104, PBF105, PBF106, PBF107, PBF108, PBF109, PBF110, PBF111, PBF112, R2F402, PBF201, PBF202, PBR203, R2F404, PBF204, R2F405, R2F406, PBF205, PBF206, R2F407, PBF207, R2F408, PBF208, PBF209, R2F501, PBF210, PBF211, R2F502, PBF212, PBF301, PBF302, R2F503, PBF303, IBGBlade101, R2F504, RgF101, PBF304, R2F404, RgF103, PBF305, R2F506, RgF104, PBF306 ::*Grammar check documents ::Project 3-1-C ::Project 3-1-D ::Project 5-1-A ::Project 5-1-B ::Project 5-2-B ::Project 5-2-C ::Project N-1-A: PBF703X, PBF703T, RgF411 ::Project N-1-B: VSG Tour 1 ::Project N-1-C :Brig. Rekio Corsair Tarentae ::Project 3-1-C ::Project 3-1-D ::Project 4-1-B ::Project 4-1-C ::Project 4-1-D ::Project 4-2-E ::Project 5-2-B ::Project N-2-A :Gen. Michael Raven ::Project N-3-A == Total Project List == :Each major project embarked upon is classed as a phase, and each phase is divided into projects, which are subsequently broken down into manageable parts. :Primary phases: ::*Phase N — Neverending (all non-terminating projects with no forseeable end) ::*Phase 1 — History (all fleet-level ITODs) ::*Phase 2 — Timeline (investigate and implement timeline dynamics) ::*Phase 3 — Context (locations and factions information) ::*Phase 4 — HoloNet (online availability of information) :Secondary phases: ::*Phase 5 — Realism (improve the quality of ITODs) ::*Phase 6 — Battles (create in-universe battle articles) ::*Phase 7 — Future (catalogue exploits of AF and ABG) === Phase 1 — History === :Began 20060327. In progress. :*Section 1 — mission entries (began 20060327 — David) :**Part A — document missions (began 20060327 — David) :**Part B — format mission entries :**Part C — create ship lists :**Part D — create summaries :*Section 2 — craft entries (began 20060327 — David) :**Part A — document craft histories (began 20060327 — David) :**Part B — ensure overall quality (began 20060811 — David) :**Part C — shipname verification (20060812 – 20060828 — David, Raven, Eric) :**Part D — develop craft statuses === Phase 2 — Timeline === :Began 20060327. In progress. :*Section 1 — investigating the timeline (began 20060327 — David) :**Part A — create chronological listing of missions (began 20060327 — David) :**Part B — acquire permission to make timeline dynamic (20060514 – 20060608 — David) :**Part C — research ITOD timeline (began 20060923 — Raven, David) :**Part D — research EU timeline :*Section 2 — moving the timeline :**Part A — establish ITOD timeline :**Part B — establish EU dates :**Part C — merge ITOD and EU timelines :**Part D — add dates to craft entries === Phase 3 — Context === :Began 20060327. In progress. :*Section 1 — locations (began 20060327 — David) :**Part A — gather location data from ITODs (began 20060327 — David) :**Part B — develop location data (began 20060327 — David) :**Part C — reconcile planet database (began 20060829 — Rekio, David, Raven) :**Part D — cartography (began 20060829 — Rekio, David) :**Part E — develop unspecified locations :*Section 2 — factions (began 20060327 — David) :**Part A — gather faction data from ITODs (began 20060327 — David) :**Part B — develop faction data :**Part C — add faction information from planet database === Phase 4 — HoloNet === :Began 20060327. In progress. :*Section 1 — office (20060428 — Rekio) :**Part A — update logistics office website (20060428 – 20060807 — Rekio) :**Part B — reorganise planets database (20060428 — Rekio) :**Part C — reorganise order of battle (20060428 — Rekio) :**Part D — maps (20060428 — Rekio) :**Part E — naval register :**Part F — storyline :*Section 2 — wiki (began 20060818 — Rekio) :**Part A — upload chronological listing of missions :**Part B — upload mission entries :**Part C — upload craft entries :**Part D — upload timeline :**Part E — upload locations (began 20060817 — Rekio) :**Part F — upload factions === Phase 5 — Realism === :Began 20060327. In progress. :*Section 1 — non-fiction (began 20060327 — David) :**Part A — push for more realism in ITODs (began 20060327 — David) :**Part B — reinstate narrative briefings to RgF (began 20060327 — David) :**Part C — reinstate narrative briefings to IBG (20060327 – 20060727 — David) :*Section 2 — fiction (began 20060725 — Raven) :**Part A — create technical information for craft lacking details (20060725 – 20060901 — Raven) :**Part B — restore realism to the order of battle (began 20060807 — Rekio, David, Raven) :**Part C — develop maps (began 20060830 — David) :**Part D — determine trade routes :**Part E — determine ship complements === Phase 6 — Battles === :Began 20060722. Oh hold. :*Section 1 — information gathering (began 20060722 — Calista: currently aborted) :**Part A — harvest current and recent pilot participation information (began 20060722 — Calista) :**Part B — harvest past pilot participation information :**Part C — gather details from mission and craft articles :*Section 2 — article writing :**Part A — write battle and skirmish articles :**Part B — write campaign overviews :**Part C — estimate casualties === Phase 7 — Future === :Began 20060717. In progress. :*Section 1 — Allegiance history (began 20060717 — Raven) :**Part A — investigate history (20060717 – 20060809 — Raven) :**Part B — extract craft information (status pending) :**Part C — extract location information (status pending) :**Part D — extract faction information (status pending) :**Part E — develop battle information (status pending) :**Part F — upload data collected (status pending) === Phase N — Neverending === :Began 20060327. In progress. :*Section 1 — David :**Part A — logistics advisement (began 20060327 — David) :**Part B — logistics planning (began 20060706 — David) :**Part C — record activity details (began 20060723 — David) :**Part D — maintain chronology :**Part E — mission entries :**Part F — craft entries :**Part G — locations :**Part H — factions :**Part I — battles :*Section 2 — Rekio :**Part A — maintain website :*Section 3 — Raven (began 20060511 — Raven) :**Part A — techical consultant (began 20060511 — Raven) :*Section 4 — Calista :**Part A — harvest pilot participation information :*Section 5 — Abi :**Part A — author news articles == Completed Projects == === March 2006 === *Phase 1 began *Capt. David Vaughan — Project 1-1-A: Began *Capt. David Vaughan — Project 1-2-A: Began *Phase 3 began *Capt. David Vaughan — Project 3-1-A: Began *Capt. David Vaughan — Project 3-1-B: Began *Capt. David Vaughan — Project 3-2-A: Began *Phase 5 began *Capt. David Vaughan — Project 5-1-A: Began *Capt. David Vaughan — Project 5-1-B: Began *Capt. David Vaughan — Project 5-1-C: Began *Phase N began *Capt. David Vaughan — Project N-1-A: Began *Capt. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: PBF101, PBF102, PBF103, PBF104, PBF105, PBF106, PBF107, PBF108, PBF109, PBF110, PBF111, PBF112, R2F402, PBF201, PBF202, PBF203, R2F404, PBF204, R2F405, R2F406, PBF205, PBF206, R2F407, PBF207, R2F408, PBF208, PBF209, R2F501, PBF210, PBF211, R2F502, PBF212, PBF301, PBF302, R2F503, PBF303, IBGBlade101, R2F504, RgF101, PBF304, R2F505, RgF102, RgF103, PBF305, R2F506, RgF104, PBF306, IBGBlade102, RgF105 === April 2006 === *Capt. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: IBG101, PBF307, R2F601, IBG102, PBF308, R2F602, IBG103, RgF106, R2F603, RgF107, PBF309, R2F604, RgF108, IBG104, R2F605, RgF109, PBF310, IBG105, RgF110, IBG106, R2F606, PBF311, IBG107, R2F607, PBF312, RgF111, RgFZodiac001, IBG108, PBF401, R2F608, IBG109, PBF402, RgF201, IBG201, IBG110, PBF403, IBG202, R2F701, PBF404, IBG111, RgF203, RgFZodiac002, IBG203, RgFZodiac003, PBF405, R2F702, RgF204, PBF406, IBG112, RgFZodiac004, R2F703, PBF407, R2F704, RgF205, RgFZodiac005, IBG204, R2F705, PBF408, IBG205, R2F706, RgF206, IBG206, PBF409, IBG207, R2F707, RgF207, PBF410, RgFZodiac101 *Phase 4 began *Lt. Col. Rekio Corsair Tarentae — Project 4-1-A: Began *Lt. Col. Rekio Corsair Tarentae — Project 4-1-B: Began *Lt. Col. Rekio Corsair Tarentae — Project 4-1-C: Began *Lt. Col. Rekio Corsair Tarentae — Project 4-1-D: Began *Capt. David Vaughan promoted to Major === May 2006 === *Maj. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: R2F708, IBG208, PBF411, RgF208, RgFZodiac102, IBG209, R2F709, PBF412, RgF209, IBG301, PBF501, PBF502, RgF210, IBG302, R2F800, RgF211, IBG303, PBF503, R2F801, IBG304, RgF301, RgF302, PBF504, IBG305, RgF303, IBG306, PBF505, RgF304, R2F802, PBF506, IBG401, IBG402, RgF305, R2F803, PBF507, IBG403, RgF306, R2F804, IBG404, PBF508, RgF307, IBG405, R2F805, RgF308, PBF509, IBG406, IBG407, R2F806, RgF309, PBF510, IBG408 *Lt. Gen. Michael Raven — Project N-3-A: Began *Phase 2 began *Maj. David Vaughan — Project 2-1-B: Began *Lt. Col. Rekio Corsair Tarentae promoted to Colonel === June 2006 === *Maj. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: PBF511, R2F807, IBG409, RgF310, PBF512, RgF311, IBG501, IBG502, PBF601, RgF312, IBG503, PBF602, RgF401, PBF603, IBG504, RgF402, R2F808, PBF604, R2F809, IBG505, RgF403, RgFAvoton101, PBF605, RgFAvoton102, IBG506, R2F900, RgF404, PBF606, IBG507, R2F901 *Maj. David Vaughan — Project 2-1-B: Completed *Maj. David Vaughan — Project N-1-A: IBG603 *Maj. David Vaughan promoted to Lieutenant Commander === July 2006 === *Lt. Cmdr. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: PBF607, IBG508, R2F902, RgF405, IBG509, RgF406, PBF608, PBF609, R2F903, PBF610, RgF407, IBG601, PBF611, R2F904, RgF408, PBF612 *Maj. David Vaughan — Project N-1-A: PBF701, R2F905, RgF410, PBF702X, PBF702T *Phase 7 began *Lt. Gen. Michael Raven — Project 7-1-A: Began *Lt. Gen. Michael Raven — Project 5-2-A: Began *Lt. Cmdr. David Vaughan — Project N-1-B: Began *Phase 6 began *Lt. Calista Fairbright — Project 6-1-A: Began *Lt. Calista Fairbright — Project 6-1-A: RgF409, IBG603, PBF701 *Lt. Cmdr. David Vaughan — Project N-1-C: Began *Lt. Calista Fairbright promoted to First Lieutenant *Lt. Cmdr. David Vaughan — Project 5-1-C: Completed *Lt. Cmdr. David Vaughan — Project N-1-C: IBG604 *Lt. Cmdr. David Vaughan promoted to Commander === August 2006 === *Cmdr. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: IBG602, RgF409, IBG603, PBF701, R2F905 *Cmdr. David Vaughan — Project N-1-C: Logistics Projects page created online. *Cmdr. David Vaughan — Project N-1-C: Phase pages created online. *Col. Rekio Corsair Tarentae — Project 4-1-A: Completed *Col. Rekio Corsair Tarentae — Project 5-2-B: Began *Lt. Gen. Michael Raven — Project 7-1-A: Completed *Phase 8 began *Col. Eric Skrevski — Project 8-1-A: Began *Phase 9 began *Col. Eric Skrevski — Project 9-1-A: Began *Cmdr. David Vaughan — Project 1-2-B: Began *Cmdr. David Vaughan — Project 1-2-C: Began *Col. Rekio Corsair Tarentae — Project 4-2-E: Began *Col. Rekio Corsair Tarentae promoted to Brigadier General *Cmdr. David Vaughan — Project 1-2-C: Completed *Cmdr. David Vaughan — Project 1-2-B: PBF101, PBF102 *Brig. Rekio Corsair Tarentae — Project 3-1-C: Began *Brig. Rekio Corsair Tarentae — Project 3-1-D: Began *Cmdr. David Vaughan — Project 5-2-C: Began === September 2006 === *Cmdr. David Vaughan — Project 1-2-B: PBF103, PBF104, PBF105, PBF106, PBF107, PBF108, PBF109, PBF110, PBF111, PBF112, R2F402, PBF201, PBF202, PBF203, R2F404, PBF204, R2F405, R2F406, PBF205 *Lt. Gen. Michael Raven — Project 5-2-A: Completed *Lt. Gen. Michael Raven — Project 2-1-C: Began === October 2006 === *Lt. Gen. Michael Raven promoted to General *Cmdr. David Vaughan promoted to Lieutenant Colonel *Lt. Col. David Vaughan — Project 1-2-B: PBF206, R2F407, PBF207