Logistics Projects: Difference between revisions

Jump to navigation Jump to search
David Vaughan (talk | contribs)
David Vaughan (talk | contribs)
Line 141: Line 141:




<br>
=== Phase 5 ===
=== Phase 5 ===
Began 20060327. In progress.
Began 20060327. In progress.
Line 150: Line 151:


*'''Project 2''' &mdash; '''fiction'''
*'''Project 2''' &mdash; '''fiction'''
**Part A &mdash; '''reconcile order of battle'''
**Part A &mdash; '''add correct ship data to order of battle'''
**Part B &mdash; '''develop maps'''
**Part B &mdash; '''reconcile order of battle ships'''
**Part C &mdash; '''determine trade routes'''
**Part C &mdash; '''develop maps'''
**Part D &mdash; '''determine ship complements'''
**Part D &mdash; '''determine trade routes'''
 
**Part E &mdash; '''determine ship complements'''


=== Phase 6 ===
=== Phase 6 ===

Revision as of 05:56, 3 August 2006

This is a list of projects that the Logistics Office is currently working on, planning to work on, and already completed.

This page is still being worked on, so sorry about the mess.


Current Projects

Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-A:

  • RgF409


Planned Projects

Priority One

Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-A:

  • IBG603
  • PBF701
  • R2F905
  • RID001


Priority Two

Project 1-2-B:

  • Split the Star Destroyer Gorgon article into two entries — the Darkstar, and the Gorgon
  • Split the Star Destroyer Kunder's Glory article into two entries — the Kunder's Pride, and the Kunder's Glory
  • Address the M/CRV group Cilliip issue — merge multiple ship entries during IBG Tour 1 into the single group
  • Split all instances of the transport group Storm into separate entries, reflecting that they are not the same vessels in every instances
  • Address the CRV group in PBF Tour 2/3
  • Add detail to Freight Transport entries, determining if they are Type C, Type H or Type K
  • Improve earlier craft entries — bring them up to the same standard as later entries

Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-A:

  • Paladin101
  • Paladin102
  • Paladin103
  • Paladin104
  • Paladin105
  • Paladin106

Project 1-2-B:

  • Grammar check documents

Project 1-2-C:

  • Identify duplicate names
  • Work with Fleet COs and ITOD builders to determine replacement names


Priority Three

Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-A:

  • RgF410
  • IBG604
  • PBF702
  • R2F1001



Total Project List

Each major project embarked upon is classed as a phase, and each phase is divided into projects, which are subsequently broken down into manageable parts.

Primary phases:

  • Phase 1History (all fleet-level ITODs)
  • Phase 2Timeline (investigate and implement timeline dynamics)
  • Phase 3Context (locations and factions information)
  • Phase 4HoloNet (online availability of information)

Secondary phases:

  • Phase 5Realism (improve the quality of ITODs)
  • Phase 6Battles (create in-universe battle articles)
  • Phase 7Future (catalogue exploits of AF and ABG)

Optional phases:

  • Phase 8Academy (catalogue Academy ITODs)
  • Phase 9Supplementary (catalogue relevant Wing ITODs)


Phase 1

Began 20060327. In progress.

  • Project 1mission entries (began 20060327)
    • Part A — document missions (began 20060327)
    • Part B — format mission entries
    • Part C — create ship lists
    • Part D — create summaries
  • Project 2craft entries (began 20060327)
    • Part A — document craft histories (began 20060327)
    • Part B — ensure overall quality
    • Part C — shipname verification
    • Part D — develop craft statuses


Phase 2

Began 20060327. In progress.

  • Project 1investigating the timeline (began 20060327)
    • Part A — create chronological listing of missions (began 20060327)
    • Part B — acquire permission to make timeline dynamic (began 20060514, completed 20060608)
    • Part C — research ITOD timeline
    • Part D — research EU timeline
  • Project 2moving the timeline
    • Part A — establish ITOD timeline
    • Part B — establish EU dates
    • Part C — merge ITOD and EU timelines
    • Part D — add dates to craft entries


Phase 3

Began 20060327. In progress.

  • Project 1locations (began 20060327)
    • Part A — gather location data from ITODs (began 20060327)
    • Part B — develop location data (began 20060327)
    • Part C — reconcile planet database
    • Part D — cartography
    • Part E — develop unspecified locations
  • Project 2factions (began 20060327)
    • Part A — gather faction data from ITODs (began 20060327)
    • Part B — develop faction data
    • Part C — add factio ninformation from planet database


Phase 4

Began 20060327. In progress.

  • Project 1office (date information)
    • Part A — upload logistics office website (date information?)
    • Part B — reorganise order of battle
    • Part C — reorganise planets database (date information?)
    • Part D — naval register
    • Part E — storyline
    • Part F — maps
  • Project 2wiki
    • Part A — upload chronological listing of missions
    • Part B — upload mission entries
    • Part C — upload craft entries
    • Part D — upload timeline
    • Part E — upload locations
    • Part F — upload factions



Phase 5

Began 20060327. In progress.

  • Project 1non-fiction
    • Part A — push for more realism in ITODs
    • Part B — reinstate narrative briefings to RgF
    • Part C — reinstate narrative briefings to IBG
  • Project 2fiction
    • Part A — add correct ship data to order of battle
    • Part B — reconcile order of battle ships
    • Part C — develop maps
    • Part D — determine trade routes
    • Part E — determine ship complements

Phase 6

Yet to be planned or begun.

  • Project 1
    • Part A — Expand on major battles, give them their own in-depth pages
    • Part B — Estimate number of casualties, us and them, neutral and total


Phase 7

Yet to be planned or begun.

  • Project 1
    • Part A — determine ABG timeline details
    • Part B — extract craft information from ABG timeline
    • Part C — extract location information from ABG timeline
    • Part D — extract faction information from ABG timeline
    • Part E — develop battle information from ABG timeline
    • Part F — upload data collected
  • Project 2
    • Part A — determine AF timeline details
    • Part B — extract craft information from AF timeline
    • Part C — extract location information from AF timeline
    • Part D — extract faction information from AF timeline
    • Part E — develop battle information from AF timeline
    • Part F — upload data collected


Phase 8

Yet to be planned or begun.

  • Project 1
    • Part A — document mission details for academy ITODs
    • Part B — upload mission details for academy ITODs to wiki
  • Project 2
    • Part A — document craft histories for academy ITODs
    • Part B — upload craft histories for academy ITODs to wiki


Phase 9

Yet to be planned or begun.

  • Project 1
    • Part A — document mission details for wing ITODs
    • Part B — upload mission details for wing ITODs to wiki
  • Project 2
    • Part A — document craft histories for wing ITODs
    • Part B — upload craft histories for wing ITODs to wiki


Phase N

  • Project 1do
    • Part A — logistics advisement
    • Part A — logistics planning
    • Part A — maintain website
    • Part A — maintain chronology
  • Project 2record
    • Part A — mission entries
    • Part B — craft entries
    • Part C — locations
    • Part D — factions
    • Part E — battles

Completed Projects

March 2006

  • David — Project 1-1-A: Began
  • David — Project 1-2-A: Began
  • David — Project 3-1-A: Began
  • David — Project 3-2-A: Began
  • David — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: PBF101, PBF102, PBF103, PBF104, PBF105, PBF106, PBF107, PBF108, PBF109, PBF110, PBF111, PBF112, R2F402, PBF201, PBF202, PBF203, R2F404, PBF204, R2F405, R2F406, PBF205, PBF206, R2F407, PBF207, R2F408, PBF208, PBF209, R2F501, PBF210, PBF211, R2F502, PBF212, PBF301, PBF302, R2F503, PBF303, IBGBlade101, R2F504, RgF101, PBF304, R2F505, RgF102, RgF103, PBF305, R2F506, RgF104, PBF306, IBGBlade102, RgF105

April 2006

  • David — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: IBG101, PBF307, R2F601, IBG102, PBF308, R2F602, IBG103, RgF106, R2F603, RgF107, PBF309, R2F604, RgF108, IBG104, R2F605, RgF109, PBF310, IBG105, RgF110, IBG106, R2F606, PBF311, IBG107, R2F607, PBF312, RgF111, RgFZodiac001, IBG108, PBF401, R2F608, IBG109, PBF402, RgF201, IBG201, IBG110, PBF403, IBG202, R2F701, PBF404, IBG111, RgF203, RgFZodiac002, IBG203, RgFZodiac003, PBF405, R2F702, RgF204, PBF406, IBG112, RgFZodiac004, R2F703, PBF407, R2F704, RgF205, RgFZodiac005, IBG204, R2F705, PBF408, IBG205, R2F706, RgF206, IBG206, PBF409, IBG207, R2F707, RgF207, PBF410, RgFZodiac101

May 2006

June 2006

July 2006

August 2006