Logistics Projects: Difference between revisions
Line 160: | Line 160: | ||
**Part E — '''determine trade routes''' | **Part E — '''determine trade routes''' | ||
**Part F — '''determine ship complements''' | **Part F — '''determine ship complements''' | ||
=== Phase 6 — Battles === | === Phase 6 — Battles === | ||
Line 172: | Line 174: | ||
**Part B — '''write campaign overviews''' | **Part B — '''write campaign overviews''' | ||
**Part C — '''estimate casualties''' | **Part C — '''estimate casualties''' | ||
=== Phase 7 — Future === | === Phase 7 — Future === |
Revision as of 09:17, 4 August 2006
The Logistics Office maintains the fictional aspects of the club, and co-ordinates storyline material into a cohesive whole.
The Office was reopened in April 2006 by then-Captain David Vaughan, and since then has been working to research and compile a detailed fictional history of the club, to aid with the planning and continuity of future campaigns.
Below is a list of all the current, proposed and completed projects of the Logistics Office.
this list is currently incomplete — it will be finished shortly
Current Projects
Cmdr. David Vaughan
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: RgF409
- Project 5-1-A, Project 5-1-B
- Project N-1-A: PBF703, R2F1002, RgF411, IBG605
- Project N-1-B: VSF Tour 1
- Project N-1-C
- I have no idea — awaiting Rekio to advise me on what he is working on currently
Lt. Gen. Michael Raven
Planned Projects
Priority One
Cmdr. David Vaughan
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: IBG603, PBF701, R2F905, RID001
Priority Two
Cmdr. David Vaughan
- Project 1-2-B:
- Split the Star Destroyer Gorgon article into two entries — the Darkstar, and the Gorgon
- Split the Star Destroyer Kunder's Glory article into two entries — the Kunder's Pride, and the Kunder's Glory
- Address the M/CRV group Cilliip issue — merge multiple ship entries during IBG Tour 1 into the single group
- Split all instances of the transport group Storm into separate entries, reflecting that they are not the same vessels in every instances
- Address the CRV group in PBF Tour 2/3
- Add detail to Freight Transport entries, determining if they are Type C, Type H or Type K
- Improve earlier craft entries — bring them up to the same standard as later entries
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-A: Paladin101, Paladin102, Paladin103, Paladin104, Paladin105, Paladin106
- Project 1-2-B: Grammar check documents
- Project 1-2-C:
- Identify duplicate names
- Work with Fleet COs and ITOD builders to determine replacement names
Priority Three
Cmdr. David Vaughan
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: RgF410, IBG604, PBF702, R2F1001
Total Project List
Each major project embarked upon is classed as a phase, and each phase is divided into projects, which are subsequently broken down into manageable parts.
Primary phases:
- Phase N — Neverending (all non-terminating projects with no forseeable end)
- Phase 1 — History (all fleet-level ITODs)
- Phase 2 — Timeline (investigate and implement timeline dynamics)
- Phase 3 — Context (locations and factions information)
- Phase 4 — HoloNet (online availability of information)
Secondary phases:
- Phase 5 — Realism (improve the quality of ITODs)
- Phase 6 — Battles (create in-universe battle articles)
- Phase 7 — Future (catalogue exploits of AF and ABG)
Optional phases:
- Phase 8 — Academy (catalogue Academy ITODs)
- Phase 9 — Supplementary (catalogue relevant Wing ITODs)
Phase 1 — History
Began 20060327. In progress.
- Project 1 — mission entries (began 20060327)
- Part A — document missions (began 20060327)
- Part B — format mission entries
- Part C — create ship lists
- Part D — create summaries
- Project 2 — craft entries (began 20060327)
- Part A — document craft histories (began 20060327)
- Part B — ensure overall quality
- Part C — shipname verification
- Part D — develop craft statuses
Phase 2 — Timeline
Began 20060327. In progress.
- Project 1 — investigating the timeline (began 20060327)
- Part A — create chronological listing of missions (began 20060327)
- Part B — acquire permission to make timeline dynamic (began 20060514, completed 20060608)
- Part C — research ITOD timeline
- Part D — research EU timeline
- Project 2 — moving the timeline
- Part A — establish ITOD timeline
- Part B — establish EU dates
- Part C — merge ITOD and EU timelines
- Part D — add dates to craft entries
Phase 3 — Context
Began 20060327. In progress.
- Project 1 — locations (began 20060327)
- Part A — gather location data from ITODs (began 20060327)
- Part B — develop location data (began 20060327)
- Part C — reconcile planet database
- Part D — cartography
- Part E — develop unspecified locations
- Project 2 — factions (began 20060327)
- Part A — gather faction data from ITODs (began 20060327)
- Part B — develop faction data
- Part C — add faction information from planet database
Phase 4 — HoloNet
Began 20060327. In progress.
- Project 1 — office (date information)
- Part A — upload logistics office website (date information?)
- Part B — reorganise order of battle
- Part C — reorganise planets database (date information?)
- Part D — naval register
- Part E — storyline
- Part F — maps
- Project 2 — wiki
- Part A — upload chronological listing of missions
- Part B — upload mission entries
- Part C — upload craft entries
- Part D — upload timeline
- Part E — upload locations
- Part F — upload factions
Phase 5 — Realism
Began 20060327. In progress.
- Project 1 — non-fiction (began 20060327)
- Part A — push for more realism in ITODs (began 20060327)
- Part B — reinstate narrative briefings to RgF (began 20060327)
- Part C — reinstate narrative briefings to IBG (20060327 – 20060727)
- Project 2 — fiction (began 20060725)
- Part A — create technical information for craft lacking details (began 20060725)
- Part B — add correct ship data to order of battle
- Part C — reconcile order of battle ships
- Part D — develop maps
- Part E — determine trade routes
- Part F — determine ship complements
Phase 6 — Battles
Began 20060722.
- Project 1 — information gathering (began 20060722)
- Part A — harvest pilot participation information (began 20060722)
- Part B — gather details from mission and craft articles
- Project 2 — article writing
- Part A — write battle and skirmish articles
- Part B — write campaign overviews
- Part C — estimate casualties
Phase 7 — Future
Began 20060717. In progress.
- Project 1 — Allegiance history (began 20060717)
- Part A — investigate history (began 20060717)
- Part B — extract craft information
- Part C — extract location information
- Part D — extract faction information
- Part E — develop battle information
- Part F — upload data collected
- Project 2 — Aurora history
- Part A — investigate history
- Part B — extract craft information
- Part C — extract location information
- Part D — extract faction information
- Part E — develop battle information
- Part F — upload data collected
Phase 8 — Academy
Yet to be started.
- Project 1 — mission entries
- Part A — collect Academy ITODs
- Part B — document mission details from Academy ITODs
- Part C — combine mission details with main continuity
- Project 2 — craft entries
- Part A — document craft histories from Academy ITODs
- Part B — combine craft details with main continuity
Phase 9 — Supplementary
Yet to be started.
- Project 1 — mission entries
- Part A — collect Wing ITODs
- Part A — document mission details from relevant Wing ITODs
- Part B — combine mission details with main continuity
- Project 2 — craft entries
- Part A — document craft histories from relevant Wing ITODs
- Part B — combine craft details with main continuity
Phase N — Neverending
Began 20060327. In progress.
- Project 1 — David
- Part A — logistics advisement (began 20060327)
- Part B — logistics planning (began 20060706)
- Part C — record activity details (began 20060723)
- Part C — maintain chronology
- Part D — mission entries
- Part E — craft entries
- Part F — locations
- Part G — factions
- Part H — battles
- Project 2 — Rekio (start date?)
- Part A — maintain website (start date?)
list possibly incomplete
- Project 3 — Raven (began 20060511)
- Part A — techical consultant (began 20060511)
- Project 4 — Calista (began 20060722)
- Part A — harvest pilot participation information (began 20060722)
- Project 5 — Abi
- Part A — author news articles
Completed Projects
March 2006
- Capt. David Vaughan — Project 1-1-A: Began
- Capt. David Vaughan — Project 1-2-A: Began
- Capt. David Vaughan — Project 3-1-A: Began
- Capt. David Vaughan — Project 3-1-B: Began
- Capt. David Vaughan — Project 3-2-A: Began
- Capt. David Vaughan — Project 5-1-A: Began
- Capt. David Vaughan — Project 5-1-B: Began
- Capt. David Vaughan — Project N-1-A: Began
- Capt. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: PBF101, PBF102, PBF103, PBF104, PBF105, PBF106, PBF107, PBF108, PBF109, PBF110, PBF111, PBF112, R2F402, PBF201, PBF202, PBF203, R2F404, PBF204, R2F405, R2F406, PBF205, PBF206, R2F407, PBF207, R2F408, PBF208, PBF209, R2F501, PBF210, PBF211, R2F502, PBF212, PBF301, PBF302, R2F503, PBF303, IBGBlade101, R2F504, RgF101, PBF304, R2F505, RgF102, RgF103, PBF305, R2F506, RgF104, PBF306, IBGBlade102, RgF105
April 2006
- Capt. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: IBG101, PBF307, R2F601, IBG102, PBF308, R2F602, IBG103, RgF106, R2F603, RgF107, PBF309, R2F604, RgF108, IBG104, R2F605, RgF109, PBF310, IBG105, RgF110, IBG106, R2F606, PBF311, IBG107, R2F607, PBF312, RgF111, RgFZodiac001, IBG108, PBF401, R2F608, IBG109, PBF402, RgF201, IBG201, IBG110, PBF403, IBG202, R2F701, PBF404, IBG111, RgF203, RgFZodiac002, IBG203, RgFZodiac003, PBF405, R2F702, RgF204, PBF406, IBG112, RgFZodiac004, R2F703, PBF407, R2F704, RgF205, RgFZodiac005, IBG204, R2F705, PBF408, IBG205, R2F706, RgF206, IBG206, PBF409, IBG207, R2F707, RgF207, PBF410, RgFZodiac101
- Capt. David Vaughan promoted to Major
May 2006
- Maj. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: R2F708, IBG208, PBF411, RgF208, RgFZodiac102, IBG209, R2F709, PBF412, RgF209, IBG301, PBF501, PBF502, RgF210, IBG302, R2F800, RgF211, IBG303, PBF503, R2F801, IBG304, RgF301, RgF302, PBF504, IBG305, RgF303, IBG306, PBF505, RgF304, R2F802, PBF506, IBG401, IBG402, RgF305, R2F803, PBF507, IBG403, RgF306, R2F804, IBG404, PBF508, RgF307, IBG405, R2F805, RgF308, PBF509, IBG406, IBG407, R2F806, RgF309, PBF510, IBG408
- Lt. Gen. Michael Raven — Project N-3-A: Began
- Maj. David Vaughan — Project 2-1-B: Began
- Lt. Col. Rekio Corsair Tarentae promoted to Colonel
June 2006
- Maj. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: PBF511, R2F807, IBG409, RgF310, PBF512, RgF311, IBG501, IBG502, PBF601, RgF312, IBG503, PBF602, RgF401, PBF603, IBG504, RgF402, R2F808, PBF604, R2F809, IBG505, RgF403, RgFAvoton101, PBF605, RgFAvoton102, IBG506, R2F900, RgF404, PBF606, IBG507, R2F901
- Maj. David Vaughan — Project 2-1-B: Completed
- Maj. David Vaughan promoted to Lieutenant Commander
July 2006
- Lt. Cmdr. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: PBF607, IBG508, R2F902, RgF405, IBG509, RgF406, PBF608, PBF609, R2F903, PBF610, RgF407, IBG601, PBF611, R2F904, RgF408, PBF612
- Lt. Gen. Michael Raven — Project 7-1-A: Began
- Lt. Gen. Michael Raven — Project 5-2-A: Began
- Lt. Cmdr David Vaughan — Project N-1-B: Began
- Lt. Calista Fairbright — Project 6-1-A: RgF409, IBG603, PBF701
- Lt. Cmdr David Vaughan — Project N-1-C: Began
- Lt. Calista Fairbright promoted to First Lieutenant
- Lt. Cmdr. David Vaughan promoted to Commander
August 2006
- Cmdr. David Vaughan — Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: IBG602
- Cmdr. David Vaughan — Project N-1-C: Logistics Projects page created online.