Logistics Projects: Difference between revisions

Jump to navigation Jump to search
David Vaughan (talk | contribs)
David Vaughan (talk | contribs)
Line 160: Line 160:
**Part E — '''determine trade routes'''
**Part E — '''determine trade routes'''
**Part F — '''determine ship complements'''
**Part F — '''determine ship complements'''


=== Phase 6 — Battles ===
=== Phase 6 — Battles ===
Line 172: Line 174:
**Part B — '''write campaign overviews'''
**Part B — '''write campaign overviews'''
**Part C — '''estimate casualties'''
**Part C — '''estimate casualties'''


=== Phase 7 — Future ===
=== Phase 7 — Future ===

Revision as of 09:17, 4 August 2006

The Logistics Office maintains the fictional aspects of the club, and co-ordinates storyline material into a cohesive whole.

The Office was reopened in April 2006 by then-Captain David Vaughan, and since then has been working to research and compile a detailed fictional history of the club, to aid with the planning and continuity of future campaigns.

Below is a list of all the current, proposed and completed projects of the Logistics Office.

this list is currently incomplete — it will be finished shortly


Current Projects

Cmdr. David Vaughan

Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: RgF409
Project 5-1-A, Project 5-1-B
Project N-1-A: PBF703, R2F1002, RgF411, IBG605
Project N-1-B: VSF Tour 1
Project N-1-C

Col. Rekio Corsair Tarentae

I have no idea — awaiting Rekio to advise me on what he is working on currently

Lt. Gen. Michael Raven

Project 5-2-A
Project 7-1-A
Project N-3-A

Lt. Calista Fairbright

Project 6-1-A

Planned Projects

Priority One

Cmdr. David Vaughan

Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: IBG603, PBF701, R2F905, RID001

Priority Two

Cmdr. David Vaughan

Project 1-2-B:
  • Split the Star Destroyer Gorgon article into two entries — the Darkstar, and the Gorgon
  • Split the Star Destroyer Kunder's Glory article into two entries — the Kunder's Pride, and the Kunder's Glory
  • Address the M/CRV group Cilliip issue — merge multiple ship entries during IBG Tour 1 into the single group
  • Split all instances of the transport group Storm into separate entries, reflecting that they are not the same vessels in every instances
  • Address the CRV group in PBF Tour 2/3
  • Add detail to Freight Transport entries, determining if they are Type C, Type H or Type K
  • Improve earlier craft entries — bring them up to the same standard as later entries
Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-A: Paladin101, Paladin102, Paladin103, Paladin104, Paladin105, Paladin106
Project 1-2-B: Grammar check documents
Project 1-2-C:
  • Identify duplicate names
  • Work with Fleet COs and ITOD builders to determine replacement names

Priority Three

Cmdr. David Vaughan

Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-1-B, Project 3-2-A: RgF410, IBG604, PBF702, R2F1001

Total Project List

Each major project embarked upon is classed as a phase, and each phase is divided into projects, which are subsequently broken down into manageable parts.

Primary phases:

  • Phase NNeverending (all non-terminating projects with no forseeable end)
  • Phase 1History (all fleet-level ITODs)
  • Phase 2Timeline (investigate and implement timeline dynamics)
  • Phase 3Context (locations and factions information)
  • Phase 4HoloNet (online availability of information)

Secondary phases:

  • Phase 5Realism (improve the quality of ITODs)
  • Phase 6Battles (create in-universe battle articles)
  • Phase 7Future (catalogue exploits of AF and ABG)

Optional phases:

  • Phase 8Academy (catalogue Academy ITODs)
  • Phase 9Supplementary (catalogue relevant Wing ITODs)


Phase 1 — History

Began 20060327. In progress.

  • Project 1mission entries (began 20060327)
    • Part A — document missions (began 20060327)
    • Part B — format mission entries
    • Part C — create ship lists
    • Part D — create summaries
  • Project 2craft entries (began 20060327)
    • Part A — document craft histories (began 20060327)
    • Part B — ensure overall quality
    • Part C — shipname verification
    • Part D — develop craft statuses


Phase 2 — Timeline

Began 20060327. In progress.

  • Project 1investigating the timeline (began 20060327)
    • Part A — create chronological listing of missions (began 20060327)
    • Part B — acquire permission to make timeline dynamic (began 20060514, completed 20060608)
    • Part C — research ITOD timeline
    • Part D — research EU timeline
  • Project 2moving the timeline
    • Part A — establish ITOD timeline
    • Part B — establish EU dates
    • Part C — merge ITOD and EU timelines
    • Part D — add dates to craft entries


Phase 3 — Context

Began 20060327. In progress.

  • Project 1locations (began 20060327)
    • Part A — gather location data from ITODs (began 20060327)
    • Part B — develop location data (began 20060327)
    • Part C — reconcile planet database
    • Part D — cartography
    • Part E — develop unspecified locations
  • Project 2factions (began 20060327)
    • Part A — gather faction data from ITODs (began 20060327)
    • Part B — develop faction data
    • Part C — add faction information from planet database


Phase 4 — HoloNet

Began 20060327. In progress.

  • Project 1office (date information)
    • Part A — upload logistics office website (date information?)
    • Part B — reorganise order of battle
    • Part C — reorganise planets database (date information?)
    • Part D — naval register
    • Part E — storyline
    • Part F — maps
  • Project 2wiki
    • Part A — upload chronological listing of missions
    • Part B — upload mission entries
    • Part C — upload craft entries
    • Part D — upload timeline
    • Part E — upload locations
    • Part F — upload factions


Phase 5 — Realism

Began 20060327. In progress.

  • Project 1non-fiction (began 20060327)
    • Part A — push for more realism in ITODs (began 20060327)
    • Part B — reinstate narrative briefings to RgF (began 20060327)
    • Part C — reinstate narrative briefings to IBG (20060327 – 20060727)
  • Project 2fiction (began 20060725)
    • Part A — create technical information for craft lacking details (began 20060725)
    • Part B — add correct ship data to order of battle
    • Part C — reconcile order of battle ships
    • Part D — develop maps
    • Part E — determine trade routes
    • Part F — determine ship complements


Phase 6 — Battles

Began 20060722.

  • Project 1information gathering (began 20060722)
    • Part A — harvest pilot participation information (began 20060722)
    • Part B — gather details from mission and craft articles
  • Project 2article writing
    • Part A — write battle and skirmish articles
    • Part B — write campaign overviews
    • Part C — estimate casualties

Phase 7 — Future

Began 20060717. In progress.

  • Project 1Allegiance history (began 20060717)
    • Part A — investigate history (began 20060717)
    • Part B — extract craft information
    • Part C — extract location information
    • Part D — extract faction information
    • Part E — develop battle information
    • Part F — upload data collected
  • Project 2Aurora history
    • Part A — investigate history
    • Part B — extract craft information
    • Part C — extract location information
    • Part D — extract faction information
    • Part E — develop battle information
    • Part F — upload data collected


Phase 8 — Academy

Yet to be started.

  • Project 1mission entries
    • Part A — collect Academy ITODs
    • Part B — document mission details from Academy ITODs
    • Part C — combine mission details with main continuity
  • Project 2craft entries
    • Part A — document craft histories from Academy ITODs
    • Part B — combine craft details with main continuity


Phase 9 — Supplementary

Yet to be started.

  • Project 1mission entries
    • Part A — collect Wing ITODs
    • Part A — document mission details from relevant Wing ITODs
    • Part B — combine mission details with main continuity
  • Project 2craft entries
    • Part A — document craft histories from relevant Wing ITODs
    • Part B — combine craft details with main continuity


Phase N — Neverending

Began 20060327. In progress.

  • Project 1David
    • Part A — logistics advisement (began 20060327)
    • Part B — logistics planning (began 20060706)
    • Part C — record activity details (began 20060723)
    • Part C — maintain chronology
    • Part D — mission entries
    • Part E — craft entries
    • Part F — locations
    • Part G — factions
    • Part H — battles
  • Project 2Rekio (start date?)
    • Part A — maintain website (start date?)

list possibly incomplete

  • Project 3Raven (began 20060511)
    • Part A — techical consultant (began 20060511)
  • Project 4Calista (began 20060722)
    • Part A — harvest pilot participation information (began 20060722)
  • Project 5Abi
    • Part A — author news articles

Completed Projects

March 2006

April 2006

  • Capt. David VaughanProject 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: IBG101, PBF307, R2F601, IBG102, PBF308, R2F602, IBG103, RgF106, R2F603, RgF107, PBF309, R2F604, RgF108, IBG104, R2F605, RgF109, PBF310, IBG105, RgF110, IBG106, R2F606, PBF311, IBG107, R2F607, PBF312, RgF111, RgFZodiac001, IBG108, PBF401, R2F608, IBG109, PBF402, RgF201, IBG201, IBG110, PBF403, IBG202, R2F701, PBF404, IBG111, RgF203, RgFZodiac002, IBG203, RgFZodiac003, PBF405, R2F702, RgF204, PBF406, IBG112, RgFZodiac004, R2F703, PBF407, R2F704, RgF205, RgFZodiac005, IBG204, R2F705, PBF408, IBG205, R2F706, RgF206, IBG206, PBF409, IBG207, R2F707, RgF207, PBF410, RgFZodiac101
  • Capt. David Vaughan promoted to Major

May 2006

June 2006

July 2006

August 2006