Logistics Projects
This is a list of projects that the Logistics Office is currently working on, planning to work on, and already completed.
This page is still being worked on, so sorry about the mess.
Current Projects
Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-A:
- RgF409
Planned Projects
Priority One
Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-A:
- IBG603
- PBF701
- R2F905
- RID001
Priority Two
- Split the Star Destroyer Gorgon article into two entries — the Darkstar, and the Gorgon
- Split the Star Destroyer Kunder's Glory article into two entries — the Kunder's Pride, and the Kunder's Glory
- Address the M/CRV group Cilliip issue — merge multiple ship entries during IBG Tour 1 into the single group
- Split all instances of the transport group Storm into separate entries, reflecting that they are not the same vessels in every instances
- Address the CRV group in PBF Tour 2/3
- Add detail to Freight Transport entries, determining if they are Type C, Type H or Type K
- Improve earlier craft entries — bring them up to the same standard as later entries
Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-A:
- Paladin101
- Paladin102
- Paladin103
- Paladin104
- Paladin105
- Paladin106
- Grammar check documents
- Identify duplicate names
- Work with Fleet COs and ITOD builders to determine replacement names
Priority Three
Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-A:
- RgF410
- IBG604
- PBF702
- R2F1001
Total Project List
Each major project embarked upon is classed as a phase, and each phase is divided into projects, which are subsequently broken down into manageable parts.
Primary phases:
- Phase 1 — History (all fleet-level ITODs)
- Phase 2 — Timeline (investigate and implement timeline dynamics)
- Phase 3 — Context (locations and factions information)
- Phase 4 — HoloNet (online availability of information)
Secondary phases:
- Phase 5 — Realism (improve the quality of ITODs)
- Phase 6 — Battles (create in-universe battle articles)
- Phase 7 — Future (catalogue exploits of AF and ABG)
Optional phases:
- Phase 8 — Academy (catalogue Academy ITODs)
- Phase 9 — Supplementary (catalogue relevant Wing ITODs)
Phase 1
Began 20060327. In progress.
- Project 1 — mission entries (began 20060327)
- Part A — document missions (began 20060327)
- Part B — format mission entries
- Part C — create ship lists
- Part D — create summaries
- Project 2 — craft entries (began 20060327)
- Part A — document craft histories (began 20060327)
- Part B — ensure overall quality
- Part C — shipname verification
- Part D — develop craft statuses
Phase 2
Began 20060327. In progress.
- Project 1 — investigating the timeline (began 20060327)
- Part A — create chronological listing of missions (began 20060327)
- Part B — acquire permission to make timeline dynamic (began 20060514, completed 20060608)
- Part C — research ITOD timeline
- Part D — research EU timeline
- Project 2 — moving the timeline
- Part A — establish ITOD timeline
- Part B — establish EU dates
- Part C — merge ITOD and EU timelines
- Part D — add dates to craft entries
Phase 3
Began 20060327. In progress.
- Project 1 — locations (began 20060327)
- Part A — gather location data from ITODs (began 20060327)
- Part B — develop location data (began 20060327)
- Part C — reconcile planet database
- Part D — cartography
- Part E — develop unspecified locations
- Project 2 — factions (began 20060327)
- Part A — gather faction data from ITODs (began 20060327)
- Part B — develop faction data
- Part C — add factio ninformation from planet database
Phase 4
Began 20060327. In progress.
- Project 1 — office (date information)
- Part A — upload logistics office website (date information?)
- Part B — reorganise order of battle
- Part C — reorganise planets database (date information?)
- Part D — naval register
- Part E — storyline
- Part F — maps
- Project 2 — wiki
- Part A — upload chronological listing of missions
- Part B — upload mission entries
- Part C — upload craft entries
- Part D — upload timeline
- Part E — upload locations
- Part F — upload factions
Phase 5
Began 20060327. In progress.
- Project 1 — non-fiction
- Part A — push for more realism in ITODs
- Part B — reinstate narrative briefings to RgF
- Part C — reinstate narrative briefings to IBG
- Project 2 — fiction
- Part A — reconcile order of battle
- Part B — develop maps
- Part C — determine trade routes
- Part D — determine ship complements
Phase 6
Yet to be planned or begun.
- Project 1
- Part A — Expand on major battles, give them their own in-depth pages
- Part B — Estimate number of casualties, us and them, neutral and total
Phase 7
Yet to be planned or begun.
- Project 1
- Part A — determine ABG timeline details
- Part B — extract craft information from ABG timeline
- Part C — extract location information from ABG timeline
- Part D — extract faction information from ABG timeline
- Part E — develop battle information from ABG timeline
- Part F — upload data collected
- Project 2
- Part A — determine AF timeline details
- Part B — extract craft information from AF timeline
- Part C — extract location information from AF timeline
- Part D — extract faction information from AF timeline
- Part E — develop battle information from AF timeline
- Part F — upload data collected
Phase 8
Yet to be planned or begun.
- Project 1
- Part A — document mission details for academy ITODs
- Part B — upload mission details for academy ITODs to wiki
- Project 2
- Part A — document craft histories for academy ITODs
- Part B — upload craft histories for academy ITODs to wiki
Phase 9
Yet to be planned or begun.
- Project 1
- Part A — document mission details for wing ITODs
- Part B — upload mission details for wing ITODs to wiki
- Project 2
- Part A — document craft histories for wing ITODs
- Part B — upload craft histories for wing ITODs to wiki
Phase N
- Project 1 — do
- Part A — logistics advisement
- Part A — logistics planning
- Part A — maintain website
- Part A — maintain chronology
- Project 2 — record
- Part A — mission entries
- Part B — craft entries
- Part C — locations
- Part D — factions
- Part E — battles
Completed Projects
March 2006
- Project 1-1-A: Began
- Project 1-2-A: Began
- Project 3-1-A: Began
- Project 3-2-A: Began
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: PBF101, PBF102, PBF103, PBF104, PBF105, PBF106, PBF107, PBF108, PBF109, PBF110, PBF111, PBF112, R2F402, PBF201, PBF202, PBF203, R2F404, PBF204, R2F405, R2F406, PBF205, PBF206, R2F407, PBF207, R2F408, PBF208, PBF209, R2F501, PBF210, PBF211, R2F502, PBF212, PBF301, PBF302, R2F503, PBF303, IBGBlade101, R2F504, RgF101, PBF304, R2F505, RgF102, RgF103, PBF305, R2F506, RgF104, PBF306, IBGBlade102, RgF105
April 2006
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: IBG101, PBF307, R2F601, IBG102, PBF308, R2F602, IBG103, RgF106, R2F603, RgF107, PBF309, R2F604, RgF108, IBG104, R2F605, RgF109, PBF310, IBG105, RgF110, IBG106, R2F606, PBF311, IBG107, R2F607, PBF312, RgF111, RgFZodiac001, IBG108, PBF401, R2F608, IBG109, PBF402, RgF201, IBG201, IBG110, PBF403, IBG202, R2F701, PBF404, IBG111, RgF203, RgFZodiac002, IBG203, RgFZodiac003, PBF405, R2F702, RgF204, PBF406, IBG112, RgFZodiac004, R2F703, PBF407, R2F704, RgF205, RgFZodiac005, IBG204, R2F705, PBF408, IBG205, R2F706, RgF206, IBG206, PBF409, IBG207, R2F707, RgF207, PBF410, RgFZodiac101
May 2006
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: R2F708, IBG208, PBF411, RgF208, RgFZodiac102, IBG209, R2F709, PBF412, RgF209, IBG301, PBF501, PBF502, RgF210, IBG302, R2F800, RgF211, IBG303, PBF503, R2F801, IBG304, RgF301, RgF302, PBF504, IBG305, RgF303, IBG306, PBF505, RgF304, R2F802, PBF506, IBG401, IBG402, RgF305, R2F803, PBF507, IBG403, RgF306,
- Project 2-1-B: Began
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: R2F804, IBG404, PBF508, RgF307, IBG405, R2F805, RgF308, PBF509, IBG406, IBG407, R2F806, RgF309, PBF510, IBG408
June 2006
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: PBF511, R2F807, IBG409
- Project 2-1-B: Completed
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: RgF310, PBF512, RgF311, IBG501, IBG502, PBF601, RgF312, IBG503, PBF602, RgF401, PBF603, IBG504, RgF402, R2F808, PBF604, R2F809, IBG505, RgF403, RgFAvoton101, PBF605, RgFAvoton102, IBG506, R2F900, RgF404, PBF606, IBG507, R2F901
July 2006
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: PBF607, IBG508, R2F902, RgF405, IBG509, RgF406, PBF608, PBF609, R2F903, PBF610, RgF407, IBG601, PBF611, R2F904, RgF408, PBF612
August 2006
- Project 1-1-A, Project 1-2-A, Project 3-1-A, Project 3-2-B: IBG602